Trainee Barracks Complex – Ft. Benning, GA
Awarded Amount: $3.5 million
Project Size: 1,002,000 sq. ft of material installed
Areas Installed: 20 barracks, 4 battalion headquarters and 1 dining facility
Products Installed: VCT, Ceramic tile, Porcelain tile, Quarry tile, Rubber base and Carpet
General Contractor: Clark/Caddell joint venture
Completed: October 2009
Project Details:
| • | Spectra was chosen because of our ability to bond the project, meet the budget and provide enough manpower to complete the job |
| • | A team of over 65 Spectra installers on the jobsite |
| • | Spectra helped specify all materials |
| • | Full time Spectra supervision on the job |
| • | Over 50 tractor trailers of materials and 25 dump trucks full of sand were coordinated and delivered on time to meet the stringent standards of the US Army Corps of Engineers |
| • | Custom tile mosaics and porcelain patterned inlays were required in some areas |
Armored Training Brigade Complex – Ft. Benning, GA
Awarded Amount: $1.4 million
Project Size: 250,000 sq. ft of material installed
Areas Installed: 3 barracks, 1 dining hall, 4 company operation facilities, 2 headquarters buildings, 2 warehouses
Products Installed: VCT, Ceramic tile, Porcelain tile and Carpet tile
General Contractor: BL Harbert International
Completed: November 2009
Project Details:
| • | Spectra was chosen because of our ability to perform large scale work and handle multiple buildings at once |
| • | A team of over 20 installers on the jobsite |
| • | Spectra specified materials given from government guidelines |
| • | Spectra coordinated multiple buildings at once—jobsite is 32 acres with 12 buildings spread across site |
Waller Hall – Ft. Lewis, Washington
Awarded Amount: $221,000
Project Size: 5,900 sq. ft of material installed
Areas Installed: Office and work station areas, waiting areas and conference rooms
Products Installed: Carpet tile
General Contractor: GSA Contract
Completed: October 2009
Project Details:
| • | Spectra was chosen because off previous experience and a good working relationship |
| • | Spectra helped specify carpet based on its environmental attributes |
| • | Vertical Installation Technology (VIT), which utilizes a custom jack system, was used to lift furniture and replace flooring eliminating relocation of employees |
| • | Spectra performed work without interrupting workflow—building is used for the in-processing and out-processing of every individual stationed at Ft. Lewis so it was important that daily routine was not interrupted. |
FY07 Air Support Operations Squadron – Ft. Lewis, Washington
Awarded Amount: $195,000
Project Size: 18,100 sq. ft of material installed
Areas Installed: Bathrooms, lobby and main stairs, offices and workspaces, locker rooms, workout rooms, lounge and break room
Products Installed: Ceramic, Porcelain, Carpet, Rubber and Marmoleum
General Contractor: Macro Z Technology
Completed: December 2008
Project Details:
| • | Spectra was chosen because off previous experience and a good working relationship |
| • | Spectra helped specify carpet and rubber flooring based on its environmental attributes |
| • | Spectra performed work without interrupting workflow—building is used by U.S. Air Force to support the missions of the Special Operations units |
Child Development Center – Ft. Lewis, Washington
Awarded Amount: $134,000
Project Size: 18,100 sq. ft of material installed
Areas Installed: Bathrooms, lobby and main stairs, offices and workspaces, locker rooms, workout rooms, lounge and break room
Products Installed: Ceramic, Porcelain, Carpet, Rubber and Marmoleum
General Contractor: Berschauer Phillips
Completed: December 2008
Project Details:
| • | Spectra was chosen because off previous experience and a good working relationship |
| • | Spectra helped specify products that qualified for U.S. Green Building LEED points |
| • | Colors and patterns of flooring materials used on this project were specifically recommended to enhance the learning environment and stimulate cognitive thinking for the specific age groups of 6 to 10 year olds. |
| • | Taraflex was specifically recommended for the multipurpose room so that the children could wear skates and roller blades. |